![consolidated edison 5 year plan consolidated edison 5 year plan](https://s3.tradingview.com/q/qsQm6fFv_mid.png)
Location: 37.09-1-67, 70, 71 2012-2016 Crompond Roadĭescription: Proposed resubdivision of three lots to create 4 lots and construct two new two-family residences.ĭescription: Proposed construction of a single-family house on well and septic. Location: 15.07-1-5 3849 Foothill StreetĬontact: Con Edison Clean Energy Businesses, Inc.ĭescription: Proposed installation of a 1.875 MW ground mounted solar panel system and Tier 2 battery energy storage system along with associated access road, electric utility upgrades, and perimeter fencing.ĭescription: Proposed Par 3 golf course on Town owned Parkland. Location: 16.08-1-4 & 17 571 East Main Street, Jefferson Valleyĭescription: Proposed 3.75 MW ground mounted solar panels disturbing 15 acres on a 19.4 acres in the R1-20 zone. The CECONY Weekly Plan, the CECONY Management Plan, the O&R Management Plan and the O&R Hourly Plan are called the Prior Plans. This site plan was previously approved by Planning Board Resolution #09-08 on March 9, 2009. Location: 35.12-1-3 2300 Catherine Streetĭescription: Proposed installation of a 698 kW DC/467 kW AC solar canopy system over existing parking with a 548 kWh Tier 1 Battery Energy Storage System and installation of a a 284 kW DC/260 kW AC ground mounted solar array on a 12.84 acre parcel in the RSP-3 zone with existing skilled nursing facility.ĭescription: Proposed two-story 3,600 SF building to be used as a 3-bay parking garage on the first floor, material storage on the second floor for one of the existing businesses within the building. The total funding anticipated over the next 5 years is 569,660,300. ED is scheduled to release second-quarter 2021 results on Aug 5, after market close. At a minimum, the City anticipates level funding throughout the implementation period of this Consolidated Plan.
![consolidated edison 5 year plan consolidated edison 5 year plan](https://ssd2.s3.amazonaws.com/tmp/2019-02-23/1550957999398-image.png)
Yorktown Rehabilitation and Nursing Center Solar Projects The City estimates the following entitlement funding allocations for Year One (2020) of the 2020- 2024 Consolidated Plan. during the five-year term, as long as the number of plugs and the capacity of the station does not decrease, and the site continues to meet all performance and reporting obligations of the Program.
![consolidated edison 5 year plan consolidated edison 5 year plan](https://callmepower.com/sites/callmepower.com/files/images/conedison-map.jpg)
shall mean the Con Edison Clean Energy Businesses, Inc. 8(a)(5) Refusal to Furnish Information 8(a)(5) Repudiation/Modification of Contract Sec 8(d)/. Location: 47.11-1-4 1300 Baptist Church Roadĭescription: Proposed 800 kW ground mounted large-scale solar energy system disturbing approximately 6 acres of a 28.85 acre horse farm in the R1-80 zone. The purpose of the Plan is to provide executives designated by the. Con Edison is excited to present its third distributed system implementation plan (DSIP) to increase customer choice and promote a sustainable and clean energy future.